Hertfordshire Community NHS Trust

Bedford Road Health Centre (1)

Improving the Energy Performance of Healthcare Buildings

 

Healthcare and community health buildings need to remain safe, comfortable and operational while energy efficiency improvements are carried out. Aran has experience delivering building fabric upgrades across healthcare estates, working alongside main contractors to identify appropriate improvements and deliver works with minimal disruption.

Our approach begins with detailed inspections and condition surveys, allowing us to understand the existing building fabric and recommend measures that provide genuine improvements in thermal performance and value for money.

From cavity wall and loft inspections through to insulation upgrades and associated remedial works, we can support projects from initial assessment through to delivery.

Bedford Road Health Centre (2)

Hertfordshire Community NHS Trust Building Fabric Upgrades

 

Aran was appointed as a subcontractor to E.S. Moss Limited as part of a building fabric upgrade programme for Hertfordshire Community NHS Trust.

The project covered five healthcare sites across Hertfordshire:

  • Danesbury Neurological Centre
  • Bedford Health Centre
  • Nevells Road Health Centre
  • Cheshunt Community Hospital
  • Park Drive Health Centre

The initial scope included cavity wall inspections across all five sites, alongside loft inspections at Danesbury Neurological Centre and Cheshunt Community Hospital. Full condition reports were produced following the cavity wall and loft inspections to help determine where improvements were required.

Bedford Road Survey

Survey-Led Recommendations


A key part of Aran's approach is ensuring that proposed works are appropriate for the individual building rather than installing measures unnecessarily.

During the loft survey at Cheshunt Community Hospital, our assessment found that the existing insulation was already sufficient. Further work would have provided limited additional benefit compared with the associated cost, so no additional loft insulation was recommended.

At Danesbury Neurological Centre, however, the survey identified a significantly greater requirement than originally anticipated.

Across five loft areas, Aran completed a full relay and tidy of 772m² of existing insulation, topped up insulation levels to 300mm throughout and removed the existing loft walkways before installing 56 linear metres of new raised walkways.

This ensured the existing insulation could perform effectively while maintaining safe access through the loft spaces.

Bedford Road Nhs Install

Cavity Wall Insulation and Remedial Works


Following cavity wall condition surveys across all five healthcare buildings, Bedford Health Centre and Danesbury Neurological Centre were identified as requiring cavity wall insulation and associated preparation works.

At Bedford Health Centre, Aran completed:

  • 60 linear metres of rubble removal and cavity cleaning
  • 44 linear metres of DPC excavation
  • 17.5 linear metres of repointing to facing brickwork
  • 350m² of Thermabead Carbon Saver cavity wall insulation

The cavity wall insulation installation is supported by a commercial IAA 25-year guarantee.

Further works are currently being planned at Danesbury Neurological Centre, including 127 linear metres of rubble removal and cavity cleaning, 164 linear metres of DPC excavation and 873m² of Thermabead Carbon Saver cavity wall insulation, also supported by a commercial IAA 25-year guarantee.

Aran Public Buildings

Supporting Public Sector Decarbonisation


Every public building presents different challenges, particularly within healthcare environments where building condition, accessibility, ongoing services and value for money all need to be carefully considered.

Aran combines detailed building assessments with practical retrofit expertise to help clients identify the measures that will deliver meaningful improvements and focus investment where it can provide the greatest benefit.

From healthcare facilities and community buildings to wider public estates, we support public sector organisations with condition surveys, cavity wall insulation, loft insulation, associated remedial works and comprehensive reporting, helping to improve building performance and support long-term decarbonisation objectives.

Planning energy efficiency improvements across a public building or estate? Speak to Aran about how we can support your project.