How long will it take to install?

External/solid wall insulation on average takes about 2 weeks from assembly to dismantle of the scaffolding. As with most building works the installation is weather dependent and can occur some delays, however this is very unlikely.

Back to FAQ

Aran Mailing List

Keep up to date with latest energy news & grants as well as Aran products & Services!

Aran News

19-06-2020 - Insulating in flood risk areas
Flooding is the most common and widespread natural disaster in the UK with thousands of homes likely to be to be at risk now or in the future.
01-06-2020 - Take control of your energy consumption now
The recent warmer weather has been enjoyed by many of us across the UK, whilst many of us may have struggled with the rise in temperature at night, resulting with an uncomfortable restless night in a warm bedroom.

Keep In Contact

Telephone : 01284 812 520
Email : info@aranservices.co.uk

Aran Services InstagramAran Services Linked InAran Services FacebookAran Services Twitter

Areas Covered

Aran Services Limited
Aran Fire Protection Limited
Aran Insulation Limited